It’s a busy city at Piscataway Landing. We are grading, sodding, installing, and digging. Even in this deep freeze our crews are working hard to put the finishing touches on these homes. Today our painters were applying some designer colors to lot 46B (seen below), and our HVAC contractor was installing thermostats. If you think this sounds exciting, just wait until we post some pictures of the competed product. Our inbox in filled with inquries right now:)
We also stopped in at lot 15C (8405 Poplar Hill Drive, Clinton MD), to check the progress on our new kitchen/sunroom design. We’ve posted before and after pictures to show the pass through into the 12×15 sunroom. We think this allows for a much more open feel. Let us know what you think. It was a good day with lots of progress.